PROJECT 1
The extension took place in two stages. In the first in 2022, the ground floor was enlarged by 46 m2, changing the functional layout. Accordion doors connecting the kitchen and dining room with the garden were installed, the entrance area was rebuilt, the installations were replaced, and underfloor heating was installed.

PROJECT 2
The extension took place in two stages. In the first in 2022, the ground floor was enlarged by 46 m2, changing the functional layout. Accordion doors connecting the kitchen and dining room with the garden were installed, the entrance area was rebuilt, the installations were replaced, and underfloor heating was installed.